Midtown · 42,000 sq ft office

Six rooftop units replaced over three weekends

Original 1998 packaged units were failing on compressor lockouts through every heat wave. Rather than shut the building down, we staged changeouts across three Saturdays with crane closures pre-approved by the city.

  • Manual N load review revealed 18% oversizing on four units
  • New high-efficiency units with economizers and BAS-ready controls
  • SMUD rebate paperwork filed by Brendco
  • Result: measured 23% reduction in summer cooling kWh year over year
Downtown · 1927 brick office building

Steam-to-hydronic boiler conversion

A failing low-pressure steam plant was leaking through the original mains. We converted the building to a condensing hot-water plant while keeping tenants heated through a Sacramento winter.

  • Two 1.5 MBH condensing boilers, primary-secondary piping
  • Temporary boiler on site for eleven days of transition
  • Zone valves and modern controls per floor
  • Result: gas usage down roughly one-third; zero winter service calls since
Elk Grove · charter school campus

Emergency chiller failure, Friday before finals week

A 120-ton air-cooled chiller lost a compressor circuit at 4 p.m. on a 104°F Friday. We had a rental chiller tied in Saturday afternoon and the permanent repair completed Monday night.

  • Rental unit sourced, delivered and piped in under 20 hours
  • Compressor replaced under residual manufacturer warranty we located in the file
  • Result: campus never closed a classroom
West Sacramento · restaurant group

Kitchen make-up air and hood balancing across four locations

Front-of-house doors were slamming and dining rooms ran negative. Every location had the same root cause: exhaust upgraded years earlier without matching make-up air.

  • Airflow measured and documented per location
  • Two MUA units replaced, two rebalanced with new drives
  • Result: passing health-department airflow checks and a noticeable drop in cook-line complaints
Rancho Cordova · medical suite

Humidity and filtration upgrade for a procedure room

Compliance required tighter humidity bands and higher filtration than the existing split system could deliver without starving airflow.

  • Fan capacity verified before MERV 13 conversion
  • Dedicated dehumidification and monitored sensors
  • Result: continuous logged compliance for two straight inspection cycles
Roseville · light industrial warehouse

Controls-only fix that saved a $90,000 quote

A competing bid recommended replacing four rooftop units. Our walkthrough found conflicting schedules and two failed outdoor-air sensors making the units fight each other.

  • Sensors replaced, sequences rewritten, schedules consolidated
  • Total invoice under $4,800
  • Result: complaint calls stopped; equipment stayed in service
Brendco technicians servicing rooftop HVAC equipment above downtown Sacramento
Rooftop changeout planning, downtown Sacramento
What clients tend to say

The reports are the reason people stay

“I've inherited buildings with no maintenance history at all. Brendco handed me a full asset list with serials in the first month.”

— Property manager, five-building portfolio

“They talked us out of a replacement twice. When they finally said replace, we didn't argue.”

— Facilities lead, medical office

Have a project in mind?

Send drawings, a nameplate photo, or just a description of the problem. We'll tell you what it realistically takes.